We have been nominated by Government of Arunachal Pradesh Public Works Department, Office of Superintending Engineer, Boleng Circle, as Quality Inspection Agency of Re-construction of Steel Suspension Bridge over Siang River.
i) NUBO (218.5 M. SPAN)
ii) KODAK (210 M. SPAN)
Work Order :